.B
Project Manager - Craig Robinson:FIREFOX:date Jan 85
.SP 1
Engineer - Rob Horning ::Project 7166
.R
.TE
.SP 2
.in .1i
.TS
tab(:);
c c c c
lw(4.2i) lw(.3i) nw(.3i) lw(4.1i).
.B
OBJECTIVES:MD :%:RESULTS, STATUS
.R
.SP 1
T{
Help get the IO_ACD solidified.
T}:2:100:T{
The memory section of the IO_ACD is frozen.  We are getting all of the features
that we need and and do not have to support features that we do not need.
T}
.SP 1
T{
Work on an evaluate environmental testing of the memory board.
T}:2:100:T{
No problems were found in the environmental tests.  I did humidity, shake,
shock, and RFI.
T}
.SP 1
T{
Update and distribute the memory board IRS.
T}:2:100:T{
I distributed the IRS the same day that the memory section of the IO_ACD
was frozen (Jan 28).
T}
.SP 1
T{
Evaluate delay line alternatives and decide on one.
T}:3:100:T{
I am going to use a transmission line delay line.  My test board delay
line had some small problems that I am confident that I can correct.
T}
.SP 1
T{
Prepare to go into PC layout.
T}:4:100:T{
I was ready to go to PC layout, but did not go because the MC-F slipped
and there was no need to go yet.
T}
.SP 1
T{
Look at signal quality on the RAM board using the exerciser.
T}:1:100:T{
All the signals looked good except for the RAS line.  I will fix this on the
next layout.
T}
.SP 1
T{
Continue to work with vendors and make sure that all the parts are ordered
for production protos.
T}:2:100:T{
I have changed some parts in the design and have made sure that the new parts
get ordered.
T}
.SP 1
T{
Test the charge pump.
T}:1:100:T{
I did some design changes to the charge pump to make it work better and
to make sure that I do not violate any specs on the drivers.  It has
a lot of margin.
T}
.SP 1
T{
Look into the patentability of the error correction used in Firefox.
T}:1:100:T{
I sent in all the information that they need to get on file at this point.
T}
.SP 1
T{
T}:::T{
I spent some time looking into the product life cycle of Firefox in order
to understand what tests need to be written and who should be responsible
for these tests.
T}
.SP 1
T{
T}:::T{
I was available to Lynn and Jim to help them with the solder joint reliability
test but they didn't need any help.
T}
.SP 1
T{
T}:::T{
T}
.TE
.in 10.1i
.sp |12v
.TS
tab(:);
cw(2.8i)
l
c
l
c
l
c
l.
.B
DEVIATIONS, ACTION
.R
.sp |15v
T{
T}
.sp |28v
.B
KEY DECISIONS
.R
.sp |30v
T{
T}
.sp |36v
.B
CONCERNS, CRITICAL ELEMENTS
.R
.sp |38v
T{
T}
.sp |49
.B
SUMMARY
.R
.sp |51
T{
T}