.pl 72v
.MT 4 1
.nr Ls 0
.po 0
.DS
.DE
.SP 5
.TS
tab(:);
cw(4.3i) cw(3.7i) cw(5.0i).
.B
Project Manager - Craig Robinson:FIREFOX:date March 85
.SP 1
Engineer - Rob Horning ::Project 7910
.R
.TE
.SP 2
.in .1i
.TS
tab(:);
c c c c
lw(4.2i) lw(.3i) nw(.3i) lw(4.1i).
.B
OBJECTIVES:MD :%:RESULTS, STATUS
.R
.SP 1
T{
Come up to speed on the parts of the CPU board that I am responsible for.
Evaluate what problems need to be solved and develop a plan for solving
the problems.  If time permits start working on solutions. 
T}:12:100:T{
I have made up a list of things to look into.  There does not appear to be
a problem with meeting the schedule and so I am approaching the problems
by solving the highest level concerns first and working down toward the more
detailed problems.  I have done a first pass ERS for the RTC and worked on
the definition of the NVM.
T}
.SP 1
T{
Work with PC layout.  Help make changes.  Red line the board.  Make sure
that the film and drill tape are in a form that the PC vendor can use.
T}:3:50:T{
The board is taking longer to change than expected.  All the footprints have
changed and I added some diodes to protect the NMOS chip.  I have not been
pushing to get it done because it looks like we can get proto boards in
about a week.
T}
.SP 1
T{
Continue to work with the MC chip designers.
T}:2:100:T{
I have kept in touch and resolved a couple of issues (added protection diodes).
T}
.SP 1
T{
Continue to work with surface mount vendors.
T}:1:100:T{
I have continue to keep in touch with the progress of the vendors.
T}
.SP 1
T{
Distribute the test responsibility list and keep it up to date.
T}:2:-:T{
I have not received feedback on the rough draft yet.
T}
.SP 1
T{
Update the RAM PERT and the state variables.
T}:1:100:T{
T}
.SP 1
T{
T}:::T{
T}
.SP 1
T{
T}:::T{
T}
.TE
.in 10.1i
.sp |12v
.TS
tab(:);
cw(2.8i)
l
c
l
c
l
c
l.
.B
DEVIATIONS, ACTION
.R
.sp |15v
T{
I spent about 5 days working on the cache/TLB problems and looking into the
availability of fast static RAM's.
T}
.sp |28v
.B
KEY DECISIONS
.R
.sp |30v
T{
T}
.sp |36v
.B
CONCERNS, CRITICAL ELEMENTS
.R
.sp |38v
T{
T}
.sp |49
.B
SUMMARY
.R
.sp |51
T{
T}