Project Manager - Tom Meyer:FIREFOX:date December 86
.SP 1
Engineer - Rob Horning ::Project 7910
.R
.TE
.SP 2
.in .1i
.TS
tab(:);
c c c c
lw(4.2i) lw(.3i) nw(.3i) lw(4.1i).
.B
OBJECTIVES:MD :%:RESULTS, STATUS
.R
.SP 1
T{
Finish the Math board documentation.  Help with tech training were needed.
T}:6:80:T{
The tech training took more time than I had expected.  I also did tech
training for the CPU board and the memory board.
T}
.SP 1
T{
Continue to work with the SRAM vendors.
T}:1:100:T{
It came down to the wire, but we did get enough real 2K x 8 SRAM's to do the
AA run.  We should not have problems with getting parts for the next runs.
T}
.SP 1
T{
Prepare for the DRAM conference in January.
T}:2:100:T{
I made my slides and sent copies to the people putting on the conference.
T}
.SP 1
T{
Help with any memory board issues that come up.
T}:1:100:T{
Just a couple of small issues came up.  I did the tech training for the
memory board.
T}
.SP 1
T{
Help with memory architecture issues.
T}:1:100:T{
I went to a meeting in Cupertino to discuss memory architecture issues.
I also wrote up a summary of the meeting and gave my inputs on the issues
that did not get discussed at the meeting.
T}
.SP 1
T{
Address math board issues and help get the AA production run started.
T}:2:100:T{
The parts list is up to date (other than a last second change that was made).
I have written the special instructions.
T}
.SP 1
T{
Work on ultra-fox.
T}:2:100:T{
I did not have a lot of time to spend on Ultra-fox.  I did discuss several
issues with VLSI people.
T}
.SP 1
T{
T}:::T{
I took 8 days of vacation in December.
T}
.TE
.in 10.1i
.sp |12v
.TS
tab(:);
cw(2.8i)
l
c
l
c
l
c
l.
.B
DEVIATIONS, ACTION
.R
.sp |15v
T{
T}
.sp |28v
.B
KEY DECISIONS
.R
.sp |30v
T{
T}
.sp |36v
.B
CONCERNS, CRITICAL ELEMENTS
.R
.sp |38v
T{
T}
.sp |49
.B
SUMMARY
.R
.sp |51
T{
T}