Project Manager - Tom Meyer:FIREFOX:date October 86
.SP 1
Engineer - Rob Horning ::Project 7910
.R
.TE
.SP 2
.in .1i
.TS
tab(:);
c c c c
lw(4.2i) lw(.3i) nw(.3i) lw(4.1i).
.B
OBJECTIVES:MD :%:RESULTS, STATUS
.R
.SP 1
T{
Work on the CA MID_BUS timing problem.  Decide what needs to be done.
T}:2:100:T{
They had a design review for the CA chip and decided to change the drivers.
This caused me to make part changes on the math board.
T}
.SP 1
T{
Continue to keep up to data on the 2K x 8 25 ns SRAM's.
T}:2:100:T{
I met with several of the SRAM vendors.  Hitachi and Toshiba expect to have
parts to qual in November.  Cypress should have parts in December and VTI
in January.
T}
.SP 1
T{
Finish up the math board documentation.  Help Ann understand the math board.
T}:5:80:T{
I am almost done with the theory of operation.  Other things came up that made
this a lower priority.
T}
.SP 1
T{
Address any problems that come up with the math board PC board.
T}:1:100:T{
The plotter went down in Loveland and so they plotted the film here.  With the
CA problems and slips, I have not needed to push to get this board soon.
T}
.SP 1
T{
Continue to help with memory board problems.  Cover things while Jim is on
vacation.
T}:3:100:T{
I helped Jim with DRC and a couple of other problems.  I also helped isolate
a problem in environmental.  We loaded a board with Hitachi RAM's ands looked
at the access time.
T}
.SP 1
T{
There may be a memory conference in California this month for all HP memory
designers.  I said that I could give a talk on packaging if they have it.
If this does not happen I will have more time to work on ultra-fox.
T}:3: - :T{
The conference is not going to be until January.  I did submit an outline
of what I plan to talk about.
T}
.SP 1
T{
Work on ultra-fox.  Continue to meet with people to discuss what it need to be.
Understand servers better.  Look into bus configurations.  Continue to look
into floating point.
T}:7:100:T{
I set up and went on the trip to Cupertino to discuss ultra-fox with several
people.  I wrote a spec (with help from Stuart and Floyd) on TAB.  We continued
to have our weekly meetings.
T}
.SP 1
T{
T}:::T{
T}
.SP 1
T{
T}:::T{
T}
.TE
.in 10.1i
.sp |12v
.TS
tab(:);
cw(2.8i)
l
c
l
c
l
c
l.
.B
DEVIATIONS, ACTION
.R
.sp |15v
T{
T}
.sp |28v
.B
KEY DECISIONS
.R
.sp |30v
T{
T}
.sp |36v
.B
CONCERNS, CRITICAL ELEMENTS
.R
.sp |38v
T{
T}
.sp |49
.B
SUMMARY
.R
.sp |51
T{
T}