Project Manager - Howell Felsenthal:Gumby?:date February 88
.SP 1
Engineer - Rob Horning ::Project PCX1
.R
.TE
.SP 2
.in .1i
.TS
tab(:);
c c c c
lw(4.2i) lw(.3i) nw(.3i) lw(4.1i).
.B
OBJECTIVES:MD :%:RESULTS, STATUS
.R
.SP 1
T{
Continue to work on SRAM specs.  Propose how to specify the output drive and
how to model the outputs.  Try to get a better idea of what the power will
be.  Give feedback on other specs and pinouts as needed.
T}:8:100:T{
I looked at a 16K x 4 Hitachi SRAM and also at the spice model for the part.
I wrote up the results and my conclusions.  This has generated some issues that
will need to be resolved.
T}
.SP 1
T{
Look into changing the parts placement to improve the thermal design.
T}:2:100:T{
We are now using a new parts placement.  The new placement may also be easier
to layout.
T}
.SP 1
T{
Get the latest pinouts for the VLSI chips.  Make sure that the clocks are is
he right places.  If needed request changes to allow for better thermal
design.
T}:2:100:T{
I could not get pinouts, but the clocks are where they are supposed to be.
I asked about doing some changes to the CPU to help with the new parts
placement, but they could not easily make the change.
T}
.SP 1
T{
Meets with SMT people to discuss the Gumby? board.  Ask about PGA problems and
heat sink problems.  Find out how Leap effects us.
T}:1:100:T{
I updated them on where we are and found out where they are.  I wrote up a
summary of our meeting.
T}
.SP 1
T{
Document PC board specs.  Let people know if things change because of the new
parts placement.
T}:1:50:T{
I did not document the specs, but I did let people know how the new parts
placement effected things.
T}
.SP 1
T{
Work on Gumby? schematics.
T}:4: - :T{
I did not get to this.
T}
.SP 1
T{
Work on Gumby? layout.
T}:3: - :T{
I did not get to this.
T}
.SP 1
T{
T}:::T{
T}
.SP 1
T{
T}:::T{
T}
.TE
.in 10.1i
.sp |12v
.TS
tab(:);
cw(2.8i)
l
c
l
c
l
c
l.
.B
DEVIATIONS, ACTION
.R
.sp |15v
T{
I worked on the Gumby? ERS.  I design reviewed the Tabasco memory controller.
T}
.sp |28v
.B
KEY DECISIONS
.R
.sp |30v
T{
T}
.sp |36v
.B
CONCERNS, CRITICAL ELEMENTS
.R
.sp |38v
T{
T}
.sp |49
.B
SUMMARY
.R
.sp |51
T{
T}