2/12/88
Rob Horning

I did some more testing and modeling with the SRMA outputs.  I have a good
idea of what causes them to act like they do.  I have started to document
what I have done and the conclusions.  I will probably have to run a few
more simulations and test to verify my conclusions, but for the most part
I am done testing.  As we get more parts and spice models I will want
to verify that my assumptions are still correct.

I measured the step current on the SRAM.  We are using 50% of the total
power.  The measured step was between 20% and 30%.  If chip enable could
be disabled for long period of time we would get a step of 100%, but this
cannot happen.

I talked to several people to make sure that I understood how the cache dump
would work during power fail so that I could verify that the 30 msec. hold
up time would work.  I documented my assumptions and distributed them to
the people who could verify them.

I looked at parts placement some more to see if I could come up with a
placement that would be better thermally.  There is a change that seems
like it would work better.  We will decide in the next week or so if we want
to make this change.

I visited Andy Vogen and Wes Melander of CSMC to talk about our surface mount
concerns.  I got a lot of good information.  I wrote up some notes about the
meeting and sent them to the the people that would be concerned.

I started looking at how to do the Gumby? schematics again and suggested 
how we should get them done.